Fairfax County · VA

Home Additions in Annandale

An addition is the one project where zoning can stop you before design starts. We are a licensed contractor in Virginia (Class A #2705183185) — we pull the permits through Fairfax County Land Development Services, coordinate the licensed trades, and hand you a written line-item scope before demolition starts.

★★★★★ 134 Reviews · A+ BBB · MHIC #111971 · VA Class A #2705183185
Permits & inspections in Fairfax County

The paperwork is the part most contractors gloss over.

An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

Your Annandale permit goes through Fairfax County Land Development Services. We pull it under our license and we hold the inspection schedule — you do not chase inspectors and you do not sign the application.

What we find in Annandale homes

The house decides half the scope.

Annandale is predominantly detached 1950s–1960s ramblers, split-levels and colonials on unusually generous lots for inside-the-Beltway Fairfax County — which is why it is one of the better places in the county to add square footage rather than reconfigure it. Additions and kitchen expansions are the common scope. Expect undersized electrical service and original supply lines behind the finishes; on a split-level, expect the addition's floor levels and roofline tie-in to be the real design problem.

What's included
  • Zoning, setback and lot-coverage review before design is finalized
  • Footings placed below the regional frost line
  • Footing and foundation inspections passed before backfill
  • Roofline, siding and HVAC tied into the existing house so it does not read as an add-on
Planning range — Fairfax County
$180 – $340 / sq ft

A planning range, not a quote. Your written line-item price comes after a free on-site walkthrough. HVAC, electrical and plumbing are performed by licensed trade partners.

22003SpringfieldFalls ChurchFairfaxBailey's Crossroads

Free Annandale walkthrough

A written, line-item scope for your home additions project. No design fee, no obligation.

By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.

Also in Annandale

One contractor for the rest of the house

Our Annandale crews cover Springfield, Falls Church, Fairfax, Bailey's Crossroads and every ZIP in the area — 22003.

Annandale home additions questions

Straight answers

Do you handle home additions in Annandale, VA?

Yes. United Developers is a licensed contractor in Virginia (Class A #2705183185) and works throughout Annandale and Fairfax County, including 22003 and nearby Springfield, Falls Church, Fairfax.

Who pulls the permit for a Annandale home additions project?

We do, under our license, through Fairfax County Land Development Services. An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

What does home additions cost in Annandale?

Most Annandale projects land in the $180 – $340 / sq ft range. That is a planning range for Fairfax County, not a quote — your written price comes after a free on-site walkthrough.

Is the Annandale walkthrough and estimate free?

Yes. The walkthrough and the written scope are free and yours to keep whether or not you hire us. There is no design fee and no consultation invoice.

How long does an addition actually take?

The build is rarely the long part — permitting and zoning review are. Expect the approval phase to run in parallel with final design, and expect us to give you a schedule that names the permit milestone rather than hiding it. We will tell you at the walkthrough if your lot has a setback or coverage problem, because that changes the whole conversation.

Book My Free Annandale Walkthrough →
CallFree Walkthrough