Fairfax County · VA

Home Additions in McLean

An addition is the one project where zoning can stop you before design starts. We are a licensed contractor in Virginia (Class A #2705183185) — we pull the permits through Fairfax County Land Development Services, coordinate the licensed trades, and hand you a written line-item scope before demolition starts.

★★★★★ 134 Reviews · A+ BBB · MHIC #111971 · VA Class A #2705183185
Permits & inspections in Fairfax County

The paperwork is the part most contractors gloss over.

An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

Your McLean permit goes through Fairfax County Land Development Services. We pull it under our license and we hold the inspection schedule — you do not chase inspectors and you do not sign the application.

What we find in McLean homes

The house decides half the scope.

McLean is large-lot housing — 1950s–1970s ramblers and colonials alongside substantial newer construction and rebuilds. On the original houses, additions are common and usually worth doing properly: matching roofline, siding and HVAC capacity so the addition does not read as an add-on. Many neighborhoods also carry HOA architectural review.

What's included
  • Zoning, setback and lot-coverage review before design is finalized
  • Footings placed below the regional frost line
  • Footing and foundation inspections passed before backfill
  • Roofline, siding and HVAC tied into the existing house so it does not read as an add-on
Planning range — Fairfax County
$180 – $340 / sq ft

A planning range, not a quote. Your written line-item price comes after a free on-site walkthrough. HVAC, electrical and plumbing are performed by licensed trade partners.

2210122102ViennaGreat FallsFalls ChurchTysons

Free McLean walkthrough

A written, line-item scope for your home additions project. No design fee, no obligation.

By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.

Also in McLean

One contractor for the rest of the house

Our McLean crews cover Vienna, Great Falls, Falls Church, Tysons and every ZIP in the area — 22101, 22102.

McLean home additions questions

Straight answers

Do you handle home additions in McLean, VA?

Yes. United Developers is a licensed contractor in Virginia (Class A #2705183185) and works throughout McLean and Fairfax County, including 22101, 22102 and nearby Vienna, Great Falls, Falls Church.

Who pulls the permit for a McLean home additions project?

We do, under our license, through Fairfax County Land Development Services. An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

What does home additions cost in McLean?

Most McLean projects land in the $180 – $340 / sq ft range. That is a planning range for Fairfax County, not a quote — your written price comes after a free on-site walkthrough.

Is the McLean walkthrough and estimate free?

Yes. The walkthrough and the written scope are free and yours to keep whether or not you hire us. There is no design fee and no consultation invoice.

How long does an addition actually take?

The build is rarely the long part — permitting and zoning review are. Expect the approval phase to run in parallel with final design, and expect us to give you a schedule that names the permit milestone rather than hiding it. We will tell you at the walkthrough if your lot has a setback or coverage problem, because that changes the whole conversation.

Book My Free McLean Walkthrough →
CallFree Walkthrough