Kitchens are the most permit-dense room in the house per square foot. We are a licensed contractor in Virginia (Class A #2705183185) — we pull the permits through the Loudoun County Department of Building and Development, coordinate the licensed trades, and hand you a written line-item scope before demolition starts.
A kitchen that keeps its existing layout may only need electrical and plumbing permits. Move a sink, a gas line or a wall and a building permit joins them. Kitchens also carry requirements specific to the room — GFCI protection at the counters and dedicated small-appliance circuits — which is why the rough-in inspection has to pass before anything gets closed up.
Your Ashburn permit goes through the Loudoun County Department of Building and Development. We pull it under our license and we hold the inspection schedule — you do not chase inspectors and you do not sign the application.
What we find in Ashburn homesAshburn is predominantly 1990s–2000s subdivision housing, and almost all of it sits under an HOA with architectural review for exterior work. The houses are modern and predictable to work in — which means the schedule risk is the HOA and permit path, not the construction. Unfinished basements are common here, so basement finishing is the most requested scope.
What's includedA planning range, not a quote. Your written line-item price comes after a free on-site walkthrough. HVAC, electrical and plumbing are performed by licensed trade partners.
A written, line-item scope for your kitchen remodeling project. No design fee, no obligation.
By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.
Our Ashburn crews cover Sterling, Leesburg, Brambleton, Broadlands and every ZIP in the area — 20147, 20148.
Yes. United Developers is a licensed contractor in Virginia (Class A #2705183185) and works throughout Ashburn and Loudoun County, including 20147, 20148 and nearby Sterling, Leesburg, Brambleton.
We do, under our license, through the Loudoun County Department of Building and Development. A kitchen that keeps its existing layout may only need electrical and plumbing permits. Move a sink, a gas line or a wall and a building permit joins them. Kitchens also carry requirements specific to the room — GFCI protection at the counters and dedicated small-appliance circuits — which is why the rough-in inspection has to pass before anything gets closed up.
Most Ashburn projects land in the $28k – $120k range. That is a planning range for Loudoun County, not a quote — your written price comes after a free on-site walkthrough.
Yes. The walkthrough and the written scope are free and yours to keep whether or not you hire us. There is no design fee and no consultation invoice.
Plan on the sink and range being out for most of the project. We stage the work so demolition, rough-in and inspection happen back to back rather than with gaps, and we give you the realistic date at the walkthrough — not the optimistic one.