MHIC #111971 · GAF Factory-Certified · A+ BBB Call (240) 880-2108

CHEVY CHASE, MD · MONTGOMERY COUNTY · GENERAL CONTRACTING

Whole-Home Renovation in Chevy Chase, MD

In Chevy Chase we routinely open plaster onto balloon framing, knob-and-tube remnants that were abandoned in place rather than removed, and previous additions built to a standard nobody would accept now. Original single-glazed sash is common and it is a review question, not just a comfort one. That is the context any honest conversation about a whole-home renovation in Chevy Chase has to start from. What we sell is not a trade, it is responsibility: one licensed general contractor carrying the scope, the schedule, the permit through the Montgomery County Department of Permitting Services, plus your municipality, the trades and the warranty, so that there is exactly one person to call and exactly one company that cannot pass the question along.

Who issues your permit in Chevy Chase. Chevy Chase is not one jurisdiction. Building permits run through the Montgomery County Department of Permitting Services, but Chevy Chase Village, the Town of Chevy Chase, Somerset and Martin's Additions are each incorporated municipalities with their own permit or review requirements layered on top. Confirming which one your address actually sits in is the first thing that has to happen, because the answer changes the sequence of approvals. A whole-home renovation involves a building permit plus electrical, plumbing and mechanical permits, and the scope frequently triggers requirements a smaller project would not — energy code compliance on the areas being altered, current-code egress and alarm requirements, and in a floodplain, the substantial improvement rules that require the entire structure to be brought into floodplain compliance when the improvement exceeds a defined share of the structure's value. Much of Chevy Chase Village is a designated historic district on the Montgomery County Master Plan for Historic Preservation. Exterior work that is visible from the public right-of-way there requires a Historic Area Work Permit reviewed by the county's Historic Preservation Commission before the building permit can be issued. Expect a long inspection sequence across every trade, with hold points at rough-in, insulation and final. Managing that calendar so trades are not stacked behind a failed inspection is a large part of what you are hiring. We pull the permits, we meet the inspectors, and we do not ask you to do either. We do not quote fees or review times, because those are set by the jurisdiction and they change — what we will tell you is exactly what gets submitted and in what order.

What a whole-home renovation in Chevy Chase actually involves

Houses of this age in Chevy Chase carry plaster over lath, knob-and-tube remnants in some attics, and original single-glazed windows. Any interior project has to plan for what opening those walls exposes. In the historic district, exterior material and design decisions are review decisions. Window profiles, porch details, railing style and siding exposure all get looked at, so the design has to be developed with that review in mind rather than corrected after a rejection.

Lead paint: the rule that applies to most of Chevy Chase

Federal law — the EPA's Renovation, Repair and Painting rule — requires that work disturbing painted surfaces in a home built before 1978 be performed by a certified firm using contained work practices, with specific cleanup afterward. Most of Chevy Chase's housing stock predates 1978, so assume this applies to your house unless someone has established otherwise. We are certified for this work and it is built into how we set up, not bolted on. Worth asking every other contractor bidding your job whether they are, and asking to see it.

What drives the cost on a Chevy Chase whole-home renovation

Anyone can publish a range. Almost nobody can publish one that survives contact with an actual house, which is why we do not. The list below is the honest version: the specific things that decide whether your project lands at the bottom or the top of whatever range you have in your head.

Months, not weeks, and the honest answer depends on scope, whether you are living in it, and how the reviewing jurisdiction handles the permit package. What we can commit to is a written schedule with milestones, and telling you promptly when something moves rather than at the end.

The mistakes we get called in to fix

One licensed team, one contract, one point of contact

We would rather over-disclose than be asked. Maryland: MHIC #111971, issued by the Home Improvement Commission and searchable in the state licensing database. General liability and workers' compensation in force, with certificates sent by our carrier on request and before signing, not after. The licensed trades on your project hold their own licenses and their own policies and pull their own trade permits, which is the legal requirement rather than a preference. Your contract is with us, and so is the responsibility.

Where we work in Chevy Chase

How a Chevy Chase project runs

  1. Free on-site consultation and a written scope. We walk the space with you, measure, look at what is behind the finishes where we can, and write down what you actually want out of the project rather than what is easiest to sell.
  2. Feasibility against Chevy Chase rules, before design. We establish what the Montgomery County Department of Permitting Services, plus your municipality will require for whole-home renovation at your address, and what your lot, your zoning and your existing house will allow. Where historic review applies, that submission is prepared and filed first, because the building permit is not useful until it clears.
  3. Fixed written scope, then permits. A line-item scope with allowances stated plainly and a change-order process agreed in advance. We prepare and submit the permit package and handle review comments ourselves.
  4. Supervised production and a clean finish. MHIC #111971, one point of contact for the whole job, trades sequenced against the inspection calendar, and a closeout that includes the punch walk, the closed permits and the product documentation in one package.

Free Chevy Chase whole-home renovation consultation

We walk the space, tell you what the Montgomery County Department of Permitting Services, plus your municipality will require, and give you a written scope. No obligation, and the permit guidance is yours either way.

Whole-Home Renovation across Chevy Chase and Montgomery County

Our crews cover Chevy Chase Village, Town of Chevy Chase, Somerset, Martin's Additions, Section Five and Rollingwood, across 20815. What buyers and appraisers in this market respond to is period-correct exteriors with fully modern interiors, and kitchens that work without gutting the character out of the house — worth knowing whether you are renovating to stay or renovating to sell.

Homeowners here usually reach us for more than one thing at a time. Related work in Chevy Chase: home additions in Chevy Chase, kitchen remodeling in Chevy Chase, bathroom remodeling in Chevy Chase, window replacement in Chevy Chase.

We came to general contracting from the outside of the house in, which is the part most remodelers subcontract and hope for the best on. That means the same company handling your interior can also handle roof replacement, siding, aluminum siding, gutters, soffit and fascia and window replacement — under one contract, with one warranty conversation instead of three companies pointing at each other about where the water came from.

Chevy Chase whole-home renovation questions

Do I need a permit for a whole-home renovation in Chevy Chase, MD?

Your reviewing authority is the Montgomery County Department of Permitting Services, plus your municipality. A whole-home renovation involves a building permit plus electrical, plumbing and mechanical permits, and the scope frequently triggers requirements a smaller project would not — energy code compliance on the areas being altered, current-code egress and alarm requirements, and in a floodplain, the substantial improvement rules that require the entire structure to be brought into floodplain compliance when the improvement exceeds a defined share of the structure's value. We confirm the requirement for your specific parcel rather than generalizing, because in this region the answer genuinely changes across a municipal boundary. We pull the permits and meet the inspections as part of the contract.

Are you licensed to do this work in Chevy Chase?

Yes. We hold MHIC #111971 with the Maryland Home Improvement Commission, and we carry general liability and workers' compensation coverage with certificates available on request. Both numbers are publicly verifiable through the state license lookups, and we would encourage you to check ours and everyone else's you are considering.

What does historic review mean for this project in Chevy Chase?

Much of Chevy Chase Village is a designated historic district on the Montgomery County Master Plan for Historic Preservation. Exterior work that is visible from the public right-of-way there requires a Historic Area Work Permit reviewed by the county's Historic Preservation Commission before the building permit can be issued. Practically, that means design decisions get made with the review standards in front of us, and the submission goes in complete. Redesigning after a rejection is the most expensive way to learn what a board wanted.

Is a whole-home renovation cheaper than building new?

Sometimes, and it depends almost entirely on the condition of the foundation, framing and envelope. What you are buying by renovating is the existing structure, the mature lot, and the ability to avoid the full zoning and site development process a new build triggers. What you are accepting is that you will find things nobody could see, which is why an honest contingency belongs in the budget from the start.

Book My Free Chevy Chase ConsultationCall (240) 880-2108
Call (240) 880-2108 Free Inspection