MHIC #111971 · GAF Factory-Certified · A+ BBB Call (240) 880-2108

KENSINGTON, MD · MONTGOMERY COUNTY · GENERAL CONTRACTING

Whole-Home Renovation in Kensington, MD

Most Kensington homeowners planning a whole-home renovation start by collecting quotes and end up managing a project nobody told them they would be managing. We do it the other way around: one licensed team, one contract, one point of contact, and the permit and approval path mapped out for your specific address before the first dollar is committed. Deep, narrow town lots with the houses set close to the street and most of the usable yard behind.

Who issues your permit in Kensington. Kensington is a small incorporated town inside Montgomery County. Building permits are handled through the county's permitting system, and the Town of Kensington layers its own review on work within town limits. Two approvals, in a specific order, and starting the second one before the first is resolved is how projects here lose weeks. A whole-home renovation involves a building permit plus electrical, plumbing and mechanical permits, and the scope frequently triggers requirements a smaller project would not — energy code compliance on the areas being altered, current-code egress and alarm requirements, and in a floodplain, the substantial improvement rules that require the entire structure to be brought into floodplain compliance when the improvement exceeds a defined share of the structure's value. The Kensington Historic District is on the Montgomery County Master Plan for Historic Preservation. Exterior alterations visible from the public right-of-way require a Historic Area Work Permit reviewed by the Montgomery County Historic Preservation Commission before a building permit issues. That covers windows, porches, roofing material, siding and additions — not just wholesale changes. Expect a long inspection sequence across every trade, with hold points at rough-in, insulation and final. Managing that calendar so trades are not stacked behind a failed inspection is a large part of what you are hiring. We pull the permits, we meet the inspectors, and we do not ask you to do either. We do not quote fees or review times, because those are set by the jurisdiction and they change — what we will tell you is exactly what gets submitted and in what order.

What a whole-home renovation in Kensington actually involves

A Kensington Victorian is balloon-framed in places, has plaster on lath, and often carries several generations of wiring in the same wall cavity. Interior work here is discovery work, and the way to control it is to open and inspect before pricing, not after. Assume that anything you change on the street-facing exterior inside the historic district is a review item. Window replacement in particular is scrutinized, because vinyl replacement units in an original opening are the single most common rejection.

The town core is Victorian-era frame houses with deep wraparound porches, turned posts and steep roofs, ringed by 1940s and 1950s capes and colonials in Rock Creek Hills and Parkwood.

Lead paint: the rule that applies to most of Kensington

Federal law — the EPA's Renovation, Repair and Painting rule — requires that work disturbing painted surfaces in a home built before 1978 be performed by a certified firm using contained work practices, with specific cleanup afterward. Most of Kensington's housing stock predates 1978, so assume this applies to your house unless someone has established otherwise. We are an EPA lead-safe certified firm and we work that way as a matter of course. If you are getting bids and nobody else has raised this, that tells you something worth knowing about the bids.

What drives the cost on a Kensington whole-home renovation

You will notice we do not publish a price range. That is deliberate: the number depends on things nobody can see from the street. Here is what genuinely moves it, so you can interrogate every estimate you receive, including ours.

Months, not weeks, and the honest answer depends on scope, whether you are living in it, and how the reviewing jurisdiction handles the permit package. What we can commit to is a written schedule with milestones, and telling you promptly when something moves rather than at the end.

The mistakes we get called in to fix

One licensed team, one contract, one point of contact

We would rather over-disclose than be asked. Maryland: MHIC #111971, issued by the Home Improvement Commission and searchable in the state licensing database. General liability and workers' compensation in force, with certificates sent by our carrier on request and before signing, not after. The licensed trades on your project hold their own licenses and their own policies and pull their own trade permits, which is the legal requirement rather than a preference. Your contract is with us, and so is the responsibility.

Where we work in Kensington

How a Kensington project runs

  1. A free visit that produces a document, not a pitch. No presentation, no same-day discount, no financing conversation before anyone has looked at the house. We measure, we photograph, we ask what is not working, and we leave you with something written you can compare against every other bid.
  2. Feasibility against Kensington rules, before design. We establish what the Montgomery County Department of Permitting Services, with town review will require for whole-home renovation at your address, and what your lot, your zoning and your existing house will allow. Where historic review applies, that submission is prepared and filed first, because the building permit is not useful until it clears.
  3. Everything priced and agreed before a permit is filed. You see the scope broken into line items, the allowances stated as real numbers rather than vague placeholders, and the process for handling anything discovered mid-project. Only then does the permit package get assembled and submitted, with us answering the reviewer rather than forwarding comments to you.
  4. One crew, one schedule, one closeout. MHIC #111971, Our own supervision on site, inspections met by us, and a documented punch walk with the permits closed out at the end.

Free Kensington whole-home renovation consultation

An unhurried visit, a straight answer about what the Montgomery County Department of Permitting Services, with town review will require at your address, and a written scope. Nothing owed, and you keep the permit guidance whether you hire us or not.

Whole-Home Renovation across Kensington and Montgomery County

Old Town Kensington, Rock Creek Hills, Ken-Gar, Kensington View, Parkwood and Chevy Chase View are all inside our regular working area, along with 20895. Kensington's Victorian core is the reason people pay to live there, and work that damages the exterior character damages the value. That constraint is real and it should shape the design from day one.

Homeowners here usually reach us for more than one thing at a time. Related work in Kensington: home additions in Kensington, kitchen remodeling in Kensington, bathroom remodeling in Kensington, window replacement in Kensington.

Most remodelers stop at the drywall. We started at the roof and worked inward, so the envelope is not a referral for us. Roof replacement, siding, aluminum siding, gutters, soffit and fascia and window replacement all sit under the same contract as the interior work, which matters most on the day somebody opens a wall and finds out why the paint kept failing.

Kensington whole-home renovation questions

Do I need a permit for a whole-home renovation in Kensington, MD?

Your reviewing authority is the Montgomery County Department of Permitting Services, with town review. A whole-home renovation involves a building permit plus electrical, plumbing and mechanical permits, and the scope frequently triggers requirements a smaller project would not — energy code compliance on the areas being altered, current-code egress and alarm requirements, and in a floodplain, the substantial improvement rules that require the entire structure to be brought into floodplain compliance when the improvement exceeds a defined share of the structure's value. We confirm the requirement for your specific parcel rather than generalizing, because in this region the answer genuinely changes across a municipal boundary. We pull the permits and meet the inspections as part of the contract.

Are you licensed to do this work in Kensington?

Yes. We hold MHIC #111971 with the Maryland Home Improvement Commission, and we carry general liability and workers' compensation coverage with certificates available on request. Both numbers are publicly verifiable through the state license lookups, and we would encourage you to check ours and everyone else's you are considering.

What does historic review mean for this project in Kensington?

The Kensington Historic District is on the Montgomery County Master Plan for Historic Preservation. Exterior alterations visible from the public right-of-way require a Historic Area Work Permit reviewed by the Montgomery County Historic Preservation Commission before a building permit issues. That covers windows, porches, roofing material, siding and additions — not just wholesale changes. Practically, that means design decisions get made with the review standards in front of us, and the submission goes in complete. Redesigning after a rejection is the most expensive way to learn what a board wanted.

How do you handle change orders?

In writing, priced, and approved before the work happens. Any contractor who does work first and prices it later is either disorganized or setting up a dispute. On a project this size the change-order process matters more than almost any other term in the contract.

Book My Free Kensington ConsultationCall (240) 880-2108
Call (240) 880-2108 Free Inspection