Anne Arundel County · MD

Home Additions in Annapolis

An addition is the one project where zoning can stop you before design starts. We are a licensed contractor in Maryland (MHIC #111971) — we pull the permits through the Anne Arundel County Department of Inspections and Permits, coordinate the licensed trades, and hand you a written line-item scope before demolition starts.

★★★★★ 139 Reviews · A+ BBB · MHIC #111971 · VA Class A #2705183185 · Licensed & Bonded in MD & VA

Start your Annapolis home additions with a written scope

Tell us the two things we need to call you back — a project manager rings you to book the free walkthrough. We work Arnold, Edgewater, Severna Park and every Annapolis ZIP: 21401, 21403, 21409.

  • A written, line-item scope for your Annapolis project before anyone swings a hammer
  • Permits pulled through the Anne Arundel County Department of Inspections and Permits under MHIC #111971
  • One project manager from demolition to final walkthrough
4.9from 139 Google reviewsRead them →
Call now — (240) 880-2108Calls answered 24/7
Book my free walkthrough

Two fields and one question. A specialist calls you back to confirm a time.

By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out. Privacy · SMS Terms

Permits & inspections in Anne Arundel County

The paperwork is the part most contractors gloss over.

An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

Your Annapolis permit goes through the Anne Arundel County Department of Inspections and Permits. We pull it under our license and we hold the inspection schedule — you do not chase inspectors and you do not sign the application.

Local to Annapolis

The City of Annapolis issues its own permits for properties inside the city, and the historic district adds a preservation review for exterior changes. Outside the city limits, permits go through Anne Arundel County instead. Which applies to you is the first thing we confirm.

What we find in Annapolis homes

The house decides half the scope.

Annapolis ranges from 18th- and 19th-century houses downtown to mid-century and newer housing outside the historic district. Downtown, expect masonry, plaster and structural surprises; the written scope after the walkthrough is the only number worth planning around.

What's included
  • Zoning, setback and lot-coverage review before design is finalized
  • Footings placed below the regional frost line
  • Footing and foundation inspections passed before backfill
  • Roofline, siding and HVAC tied into the existing house so it does not read as an add-on
Planning range — Anne Arundel County
$180 – $340 / sq ft

A planning range, not a quote. Your written line-item price comes after a free on-site walkthrough. HVAC, electrical and plumbing are performed by licensed trade partners.

Financing is available — most homeowners spread a project this size over monthly payments rather than paying cash up front.

214012140321409ArnoldEdgewaterSeverna ParkParole

Free Annapolis walkthrough

A written, line-item scope for your home additions project. No design fee, no obligation.

By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.

★★★★★
Legitimately excellent. If your roof qualifies to be replaced due to storm damage, go with United Developers. Anthony was with me every step of the way — through the claims process and after the install.
Alex Gray · verified Google review

139 reviews at 4.9 stars across Google, and most of them are for our roofing and exterior work — that is the business we started in. The crew, the licences and the paperwork are the same ones now carrying home additions projects. Read all our reviews →

Also in Annapolis

One contractor for the rest of the house

Our Annapolis crews cover Arnold, Edgewater, Severna Park, Parole and every ZIP in the area — 21401, 21403, 21409.

Annapolis home additions questions

Straight answers

Do you handle home additions in Annapolis, MD?

Yes. United Developers is a licensed contractor in Maryland (MHIC #111971) and works throughout Annapolis and Anne Arundel County, including 21401, 21403, 21409 and nearby Arnold, Edgewater, Severna Park.

Who pulls the permit for a Annapolis home additions project?

We do, under our license, through the Anne Arundel County Department of Inspections and Permits. An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

What should I expect in a Annapolis home?

Annapolis ranges from 18th- and 19th-century houses downtown to mid-century and newer housing outside the historic district. Downtown, expect masonry, plaster and structural surprises; the written scope after the walkthrough is the only number worth planning around.

What does home additions cost in Annapolis?

Most Annapolis projects land in the $180 – $340 / sq ft range. That is a planning range for Anne Arundel County, not a quote — your written price comes after a free on-site walkthrough.

Is the Annapolis walkthrough and estimate free?

Yes. The walkthrough and the written scope are free and yours to keep whether or not you hire us. There is no design fee and no consultation invoice.

How long does an addition actually take?

The build is rarely the long part — permitting and zoning review are. Expect the approval phase to run in parallel with final design, and expect us to give you a schedule that names the permit milestone rather than hiding it. We will tell you at the walkthrough if your lot has a setback or coverage problem, because that changes the whole conversation.

Book My Free Annapolis Walkthrough →
Call (240) 880-2108Free Walkthrough