The parts that matter most in a bathroom are the ones you cannot see afterward. We are a licensed contractor in Maryland (MHIC #111971) — we pull the permits through the Montgomery County Department of Permitting Services, coordinate the licensed trades, and hand you a written line-item scope before demolition starts.
Bathrooms almost always need plumbing and electrical permits, plus a building permit if the layout moves. Two requirements catch homeowners out: GFCI protection, and exhaust ventilation that actually terminates outside the building rather than into a joist bay or an attic. Both get checked at inspection.
Your Gaithersburg permit goes through the Montgomery County Department of Permitting Services. We pull it under our license and we hold the inspection schedule — you do not chase inspectors and you do not sign the application.
Gaithersburg runs its own permitting for properties inside the city limits — a separate submission and separate inspectors from Montgomery County DPS. A Gaithersburg mailing address does not always mean you are inside the city, and which side of that line you are on decides where the permit goes. We confirm it before filing.
Gaithersburg spans 1960s–1980s subdivisions in the older sections and heavy 1990s–2000s townhome and single-family development further out. In the earlier neighborhoods, expect original electrical service and kitchens that have never been opened up; in the newer ones, the constraint is usually the HOA architectural review rather than the house.
What's includedA planning range, not a quote. Your written line-item price comes after a free on-site walkthrough. HVAC, electrical and plumbing are performed by licensed trade partners.
A written, line-item scope for your bathroom remodeling project. No design fee, no obligation.
By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.
Our Gaithersburg crews cover Germantown, Montgomery Village, Washington Grove, Rockville and every ZIP in the area — 20877, 20878, 20879, 20882, 20886.
Yes. United Developers is a licensed contractor in Maryland (MHIC #111971) and works throughout Gaithersburg and Montgomery County, including 20877, 20878, 20879, 20882 and nearby Germantown, Montgomery Village, Washington Grove.
We do, under our license, through the Montgomery County Department of Permitting Services. Bathrooms almost always need plumbing and electrical permits, plus a building permit if the layout moves. Two requirements catch homeowners out: GFCI protection, and exhaust ventilation that actually terminates outside the building rather than into a joist bay or an attic. Both get checked at inspection.
Gaithersburg runs its own permitting for properties inside the city limits — a separate submission and separate inspectors from Montgomery County DPS. A Gaithersburg mailing address does not always mean you are inside the city, and which side of that line you are on decides where the permit goes. We confirm it before filing.
Most Gaithersburg projects land in the $12k – $45k range. That is a planning range for Montgomery County, not a quote — your written price comes after a free on-site walkthrough.
Yes. The walkthrough and the written scope are free and yours to keep whether or not you hire us. There is no design fee and no consultation invoice.
Because half the work is invisible. A quote that assumes your existing subfloor, supply lines and venting are all reusable will always look cheaper than one that budgets for what is actually behind the wall. We open up, look, and put the real scope in writing before you commit.