An addition is the one project where zoning can stop you before design starts. We are a licensed contractor in Maryland (MHIC #111971) — we pull the permits through the Anne Arundel County Department of Inspections and Permits, coordinate the licensed trades, and hand you a written line-item scope before demolition starts.
An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.
Your Severna Park permit goes through the Anne Arundel County Department of Inspections and Permits. We pull it under our license and we hold the inspection schedule — you do not chase inspectors and you do not sign the application.
Much of Severna Park sits within Maryland's Chesapeake Bay Critical Area — the regulated zone near tidal water. Inside it, additions and any increase in impervious surface carry extra review and limits beyond the standard Anne Arundel County permit. If your lot is near the water, this shapes what an addition can even be before design starts.
Severna Park is largely mid- to late-20th-century housing, much of it on or near the water. Waterfront and near-water properties bring both the Critical Area rules above and the moisture and structural conditions that come with the location.
What's includedA planning range, not a quote. Your written line-item price comes after a free on-site walkthrough. HVAC, electrical and plumbing are performed by licensed trade partners.
A written, line-item scope for your home additions project. No design fee, no obligation.
By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.
Our Severna Park crews cover Arnold, Pasadena, Millersville, Annapolis and every ZIP in the area — 21146.
Yes. United Developers is a licensed contractor in Maryland (MHIC #111971) and works throughout Severna Park and Anne Arundel County, including 21146 and nearby Arnold, Pasadena, Millersville.
We do, under our license, through the Anne Arundel County Department of Inspections and Permits. An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.
Much of Severna Park sits within Maryland's Chesapeake Bay Critical Area — the regulated zone near tidal water. Inside it, additions and any increase in impervious surface carry extra review and limits beyond the standard Anne Arundel County permit. If your lot is near the water, this shapes what an addition can even be before design starts.
Most Severna Park projects land in the $180 – $340 / sq ft range. That is a planning range for Anne Arundel County, not a quote — your written price comes after a free on-site walkthrough.
Yes. The walkthrough and the written scope are free and yours to keep whether or not you hire us. There is no design fee and no consultation invoice.
The build is rarely the long part — permitting and zoning review are. Expect the approval phase to run in parallel with final design, and expect us to give you a schedule that names the permit milestone rather than hiding it. We will tell you at the walkthrough if your lot has a setback or coverage problem, because that changes the whole conversation.