Montgomery County · MD

Home Additions in Silver Spring

An addition is the one project where zoning can stop you before design starts. We are a licensed contractor in Maryland (MHIC #111971) — we pull the permits through the Montgomery County Department of Permitting Services, coordinate the licensed trades, and hand you a written line-item scope before demolition starts.

★★★★★ 134 Reviews · A+ BBB · MHIC #111971 · VA Class A #2705183185
Permits & inspections in Montgomery County

The paperwork is the part most contractors gloss over.

An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

Your Silver Spring permit goes through the Montgomery County Department of Permitting Services. We pull it under our license and we hold the inspection schedule — you do not chase inspectors and you do not sign the application.

What we find in Silver Spring homes

The house decides half the scope.

Inside the Beltway, Silver Spring is dense 1920s–1950s bungalow, cape and colonial stock on small lots; further out it is later subdivisions. On the older houses, a kitchen or bath project is usually also an electrical project, because the original service was never sized for a modern kitchen.

What's included
  • Zoning, setback and lot-coverage review before design is finalized
  • Footings placed below the regional frost line
  • Footing and foundation inspections passed before backfill
  • Roofline, siding and HVAC tied into the existing house so it does not read as an add-on
Planning range — Montgomery County
$180 – $340 / sq ft

A planning range, not a quote. Your written line-item price comes after a free on-site walkthrough. HVAC, electrical and plumbing are performed by licensed trade partners.

20901209022090320904209052090620910WheatonTakoma ParkKensingtonColesville

Free Silver Spring walkthrough

A written, line-item scope for your home additions project. No design fee, no obligation.

By submitting you agree United Developers may call or text you about your request, including by autodialed/automated means and AI voice, at the number provided. Consent is not a condition of purchase. Msg/data rates may apply. Reply STOP to opt out.

Also in Silver Spring

One contractor for the rest of the house

Our Silver Spring crews cover Wheaton, Takoma Park, Kensington, Colesville and every ZIP in the area — 20901, 20902, 20903, 20904, 20905, 20906, 20910.

Silver Spring home additions questions

Straight answers

Do you handle home additions in Silver Spring, MD?

Yes. United Developers is a licensed contractor in Maryland (MHIC #111971) and works throughout Silver Spring and Montgomery County, including 20901, 20902, 20903, 20904 and nearby Wheaton, Takoma Park, Kensington.

Who pulls the permit for a Silver Spring home additions project?

We do, under our license, through the Montgomery County Department of Permitting Services. An addition starts with zoning, not construction: setbacks, lot coverage and height limits get reviewed before a building permit is issued, and in some neighborhoods there is a stormwater or historic review on top. Then come the footing and foundation inspections, which have to pass before backfill. This is the longest-lead permit of any project we do, and it is why we start the paperwork while the design is still being drawn.

What does home additions cost in Silver Spring?

Most Silver Spring projects land in the $180 – $340 / sq ft range. That is a planning range for Montgomery County, not a quote — your written price comes after a free on-site walkthrough.

Is the Silver Spring walkthrough and estimate free?

Yes. The walkthrough and the written scope are free and yours to keep whether or not you hire us. There is no design fee and no consultation invoice.

How long does an addition actually take?

The build is rarely the long part — permitting and zoning review are. Expect the approval phase to run in parallel with final design, and expect us to give you a schedule that names the permit milestone rather than hiding it. We will tell you at the walkthrough if your lot has a setback or coverage problem, because that changes the whole conversation.

Book My Free Silver Spring Walkthrough →
CallFree Walkthrough